Repeatable and Efficient Integration
Active Power engineers looked at the legacy approach to power infrastructure deployment and thought, “There has to be a better way.” We set out to eliminate the time, cost and uncertainty inherent to delivery, testing, integration and commissioning of every individual component as it arrives on site. In the process, we eliminated the risk and cost of inconsistencies between how a design looks on paper and how it works in the real world.
|
|
Customer Focused Project Management
Single Source Accountability
PowerHouse architecture is pre-assembled and tested offsite, taking the guess-work and unknowns out of the installation and commissioning phase. System components are chosen much like any other power infrastructure. The critical difference is the integration and testing happens at an ISO 9001 certified factory rather than your construction site. When the concrete pad is poured, the pre-tested power infrastructure is deployed and ready to power up.
The cost savings associated with a one-piece manufacturing flow far exceeds anything remotely possible on a construction site and the guaranteed performance and reliability provides priceless peace of mind.
|